ELNG Administration Building is a two floor building ( Ground + First Floor ) having a total surface area about 1500 m2 and ceiling height of about 3.5 mt each floor .This area shall be centrally air conditioned via Fan Coil Unit (F.C.U) on rooms and two Air Handling Unit (A.H.U) one for each floor for fresh air to rooms ,Corridors will be conditioned by indirect way threw the positive pressure of rooms by using under cut room doors .

Contaminated air shall be partially extracted from toilets and other contaminated zones (such as Buffet) via axial exhaust fans.

The central water chilling system shall consist of two water cooled ,direct fired absorption chillers +2 cooling towers C/W two sets (chilled and condenser water ) pumps .Water chillers shall supply chilled water to air handling units via a set of two ( 1 operating + 1 standby ) chilled water pumps and a chilled water piping system.

Water chillers, cooling towers, chilled and condenser cooling water pumps shall be installed on roof top of the building.

 
     
 
 
 
 
 
 
 
-------------------------------------------------------------------------------------------
Home | M.O.G.A | Projects | Services | Team | Clients | Partners | News | Site Map| Contact
2006 mogadesignegypt.  All rights reserved.